|
Reaction on low and medium voltage level - Power Quality |
A. Eberle was allowed to support two workshops with the topics system perturbation on the TV channel WDR in Cologne on 27th October 2009 and 18th November 2009.
Approximately 100 participants from utilities, communities and heavy industries as well as the entertaining area took part. Mr. Blum, Product Manager for Power Quality, introduced theory and practical experience of EN50160 e.g. IEC 61000-2-2 with firmly installed devices PQI-D(A) and the mobile net analyser PQ-Box 100. |  | Here we would like to give our special thanks to Mr. Höfer from the WDR TV-station.
|  | |