Tips & Tricks II

For Using Power Quality Meters and Typical User Errors

This Topic Is Divided Into Two Posts (Tips and Tricks Part 1 and Part 2). This Is the Part 2.

Theoretical Basics

When using mobile network analyzers, the question often arises as to how the measuring device can be supplied with power, since power outlets are rarely available in the vicinity. This applies both to the house connection and to cable distribution boxes outdoors or, as shown in the example below, at a concrete pole station.

1 Outdoor-Measuring with a PQ-Box 150

One possibility is to connect the measuring device directly via the voltage taps at the measuring point. However, it is important to ensure that the voltage to which the device is connected corresponds to the technical data of the power supply unit, as the measuring range of the devices is usually greater than what the power supply unit can handle. The power supply units of the PQ boxes can be operated between 100 and 500 volts with AC or DC, however, when used in a 690V industrial network, for example, it should be ensured that the voltage is not too high, otherwise the device or the power supply unit can be damaged. Also, a voltage that is too low can harm switching power supplies as well, as it will thermally overload them due to the high current. It is important to consider the correct voltage for the power supply when connecting devices to the measurement voltages. When making measurements on voltage transformers in a medium voltage network, measurement devices could theoretically be supplied with 100V from the chained voltage, but this is not recommended.


It should be noted that switching power supplies, cause harmonics. These current harmonics cause corresponding voltage harmonics at the high load of the voltage transformer and thus falsify the result of an evaluation of the voltage quality. For a pure power measurement, the supply of the devices via medium voltage transformers can be considered.

2 Before starting the measurement: check if all voltages are connected correctly

Before starting the recording for the week, it is important to check if all voltages and currents are connected correctly. This can be checked very easily via the display of the devices. When using current clamps, make sure that they are always tightly closed, as even a small opening can lead to large measurement errors.
A negative sign of the active power indicates that the system is feeding power back into the grid, while a positive sign means that the system is drawing power from the grid. If the power flow or the sign of the power is incorrect, the current clamp has been installed in the wrong direction and must be rotated by 180°.
If the assignment of voltages and currents does not match the correct phase in the network, this can be recognized quite easily in the online pointer diagram or also in the displayed phase angle between voltage and current.

Current Measurement at Bundle Conductors

3 Current measurement at bundle conductors

When measuring currents on bundle conductors (in this case 12 single conductors per phase), it should be noted that the currents in the individual single conductor cables can be distributed very asymmetrically. Thus, it is often not possible to place the Rogowski current clamp around only 1/3 of the cable and then multiply this measured value by 3. An alternative would be to use Rogowski coils of sufficient length and place them around the complete cable bundle.

4 FFT spectral analysis up to 20kHz

Is my measurement device capable of detecting the desired high-frequency disturbance? An FFT analysis was performed to detect the frequencies, harmonics and switching frequencies in the local network. This local network is the subject of numerous complaints from customers. Equipment failures, malfunctions, and whistling noises in equipment or bell transformers are the most common complaints. In this example, it is the suparharmonic frequencies that clearly stand out.

5 The right PQ box for every frequency range

The EN50160 offers only limited help with regard to the identified disturbances in the range of super harmonics. This standard is limited to the evaluation up to the 25th harmonic. There are no compatibility levels above 1,250 hertz. In comparison, the EMC standard IEC61000-2-2 has limits and compatibility levels for the public low-voltage network up to 150 kilohertz.
The measuring device and also the current clamps that are used must be able to detect the desired disturbance. As an example, the PQ-Box 100 is considered in Figure 6. This scans at a sampling rate of 10.24 kilohertz and therefore would not be able to detect the 10 kilohertz repercussion. Its bandwidth is limited to 5 kilohertz. To capture this disturbance, the PQ boxes 150 to 300 would be better suited, operating at sampling rates from 20 to over 400 kilohertz. Picture No. 6 was taken with a PQ-Box 200 and shows the interference signal in the oscilloscope image.

6 Example: Oscilloscope image recorded with PQ-Box 100 (10kHz)

An oscilloscope image recorded with a PQ-Box 100 serves as an example here. It shows a perfect sine wave.

7 The oscilloscope image at the same measuring point with a PQ-Box 200 (40kHz)

In comparison, measurements were taken again at the same measuring point using a PQ-Box 200 with a sampling rate of 40 kilohertz (Figure 7). Here, the 10 kilohertz can clearly be seen as a feedback effect with a level of 1.7 volts, which is the cause of the problems with various loads.

Trigger Settings

When considering which measurement data to acquire with a power quality analyzer, it is important to choose the trigger criterion carefully. Usually, a trigger threshold is taken for when fast fault records are triggered, such as falling below or exceeding a voltage or current threshold. This setting makes it possible to record mains dips or starting currents of machines as oscilloscope image or ½ period recorder.

8 Set prehistory/posthistory of trigger events

However, in order to record the cause of failures of systems or consumers, it can be useful to trigger an undershooting of a current threshold. Since the trigger criterion is usually only fulfilled when the system fails, a long history is required for later evaluation.
All PQ boxes have the possibility to record up to 600 seconds of prehistory. In this way, the evaluation of the measurement data over a long period of time before the failure of the system recognizes the reason

9 Example; ½ period recorder failure CHP (combined heat and power unit) with long history before the fault.

In the example, a network analysis was performed on a CHP unit that failed several times a week. A clear trigger criterion that occurs when the CHP unit fails is that a current threshold is undershot. The nominal current of the plant was 70A. A value of 60A was set as the trigger threshold. If the plant current drops below this value, the PQ box in this example records 100 seconds of pre-disturbance history and 20 seconds of post-disturbance history. The reason for the disturbance could be found via the prehistory.

Author
Jürgen Blum, Product Manager Power Quality Mobil

Want More Information About Our Products?

Contact Us Here!


Contact

News From the Product Groups

Power Quality | – News

Blogpost

International Partner Week 2026 - Exchange, knowledge transfer and collaboration in Nuremberg

We were delighted to welcome our international partners to Partner Week 2026. The chance to chat in person, seeing familiar faces and making new acquaintances made the week a special one for us.

Read more

Blogpost

Grid Automation 2026: Guide for Modern Distribution Grids

Grid automation 2026: guide to monitoring, power quality, feeder measurement and transparent distribution grids.

Read more

Blogpost

Low Voltage Regulation: Guide for Stable LV Grids 2026

Low voltage regulation: stabilise LV grids with measurement data, monitoring and LVRSys® for PV, EV charging and heat pumps.

Read more

General Knowledge

Electrical Resistance

Electrical resistance is one of the fundamental quantities in electrical engineering. This article explains the definition, unit, symbol, Ohm's law, resistance measurement and the role of resistance in circuits and power networks.

Read more

General Knowledge

Measuring Equipotential Bonding

Measuring equipotential bonding is essential for verifying low-resistance, continuous connections between conductive parts. This article explains equipotential bonding, relevant standards, typical measurement methods and its importance for safety, EMC, power quality and reliable grid operation.

Read more

Blogpost

Power Quality Analysis 2026: Guide to Measurement & Assessment

Power quality analysis 2026: guide to standards, Class A measurement, monitoring, and practical assessment workflows.

Read more

General Knowledge

Insulation Resistance and Insulation Measurement

Insulation measurement helps assess the safety and condition of electrical installations. This article explains insulation resistance measurement, relevant limits, test voltages and practical interpretation in real grid operation.

Read more

Webinar

»PQMobil« Webinar: Power Quality Analysis in Public & Industrial Power Grids with A. Eberle PQ-Boxes - Part 4

Webinar recording from 2026-04-15: »PQMobil - Power Quality Analysis in Public & Industrial Power Grids – Part 4«.

Read more

Blogpost

Grid Monitoring for Energy Suppliers Guide 2026: Getting Started

Grid Monitoring for Energy Utilities: Technologies, Selection, Implementation, and Best Practices for Greater Grid Transparency.

Read more

Blogpost

A. Eberle and Bregal Unternehmerkapital enter into a growth partnership

A. Eberle and Bregal enter into a growth partnership. The partnership with BU is intended to accelerate A. Eberle’s international expansion, innovation and technological advancement.

Read more

General Knowledge

Power Plant Controller: Measurement Values at the Grid Connection Point

Power Plant Controller operation at the grid connection point depends on low-latency, accurate, and dynamically reliable measurement values. This article explains the technical requirements, the role of PQI-DA smart and PQI-DE, and why actual-value feedback must be clearly separated from formal verification under VDE-AR-N 4110/4120.

Read more

Webinar

»PQ-Box ONE« Webinar: The New Single-Phase Power Quality Analyser for Measurements

Webinar recording from 2026-02-25: »PQ-Box ONE« - The New Single-Phase Power Quality Analyser for Measurements

Read more

General Knowledge

Measuring Harmonics: Detecting Disturbances in Buildings

Harmonic distortion and supraharmonics can cause flicker, nuisance tripping and device malfunctions in modern buildings. This article explains how to measure harmonics at the socket outlet and interpret spectra (e.g., around 17 kHz) to identify the root cause.

Read more

Blogpost

Power Quality Monitoring for Electrical Contractors - Mobile Network Quality Measurement with the PQ-Box ONE

How a portable power quality analyzer like the PQ-Box ONE helps electrical professionals identify voltage disturbances, improve documentation and make reliable technical decisions.

Read more

Blogpost

Power Quality Analyzer Guide: Your Entry Point for 2026

Comprehensive 2026 guide to power quality analysers: selection criteria, applications, standards, and future trends for reliable power quality monitoring.

Read more

Blogpost

Short video presentation »PQ-Box ONE«

Ahead of the official launch on February 25, 2026, we are releasing a short video about the new »PQ-Box ONE« that provides an initial overview of the key features of the new PQ measuring device.

Read more

Blogpost

»PQ-Box 150« and »PQ-Box ONE«

PQ-Box 150 and PQ-Box ONE in practical comparison: PQ-Box 150 and PQ-Box ONE both deliver Class A measurements, but differ in terms of installation, handling and areas of application.

Read more

Blogpost

Power Quality Monitoring: Risks of Poor Power Quality

Power quality monitoring translates “invisible” disturbances into measurable causes and KPI impacts. This guide explains common power-quality events and a practical workflow to measure, evaluate and derive corrective actions.

Read more

Webinar

»Cyber Security« Webinar: A Challenge for European Energy Companies

Webinar recording from 2025-11-26: »Cyber Security« - A Challenge for European Energy Companies

Read more

Blogpost

A. Eberle at the Schwabach City Run 2025

A. Eberle was represented by 37 participants at the 2025 Schwabach City Run, setting a new internal record for participation. Particularly noteworthy is Benjamin Rentsch's first place in the M 35 40 age group and third place overall.

Read more

Training Video

»PQMobil« Training Video 8: Setting up remote access for the PQ-Box

This video shows how to configure a PQ-Box remotely via Wi-Fi, LAN, network, and the Internet using a VPN tunnel, view live data, and transfer measurement data. Enjoy the video.

Read more

General Knowledge

Total Harmonic Distortion (THD) in Low Voltage Networks

This study examines harmonic distortion in modern low-voltage grids, showing real measurement data, key standards (EN 50160, IEC 61000-3-2/-4-30) and practical ways to reduce THD in applications such as EV charging, PV systems, battery storage and hybrid working environments.

Read more

Special Publication

Power Quality Monitoring in Buildings - A Key Factor in Modern Building Design

Discover how Power Quality Monitoring in Buildings improves reliability, efficiency and grid stability. Learn more in our technical article.

Read more

Special Publication

Continuous Power Quality Monitoring in the Jupiter Data Centre - Voltage Quality at Exascale Level

With JUPITER, Forschungszentrum Jülich operates Europe's fastest supercomputer and sets new standards for energy efficiency, grid stability, and standard-compliant power quality with PQSys from A. Eberle.

Read more

Webinar

»PQSys« Webinar: »WebPQ®« - The New Power Quality Software for Continuous Grid Monitoring

Webinar recording from 2025-09-25: »PQSys« Webinar: »WebPQ®« - The New Power Quality Software for Continuous Grid Monitoring

Read more

Contact request:



* Mandatory

Your data is being processed

a-eberle kontakt newsletter ×

The download started automatically in a new window.

How did you hear about us?
Consent to data transfer*

* Mandatory fields