+++ ONLY UNTIL DECEMBER 31st: PQ-Box Trade-In Promotion +++ Only a few days left to save on your PQ-Box order +++ Click here for all further information! +++

+++ ONLY UNTIL DECEMBER 31st: PQ-Box Trade-In Promotion +++ Only a few days left to save on your PQ-Box order +++ Click here for all further information! +++

+++ ONLY UNTIL DECEMBER 31st: PQ-Box Trade-In Promotion +++ Only a few days left to save on your PQ-Box order +++ Click here for all further information! +++

Current Injection for Low or Highly Variable Zero Sequence Voltages

CIF

störschreiber-gerät
The right component shape for every application
erdschluss-kompensieren
Standard version for 20 kV networks to 1000 A Ice
rundsteuersignalanalyse
IO wiring with CIF possible
Simulation-Messwerte-Prozesswerte
Current injection with manual power reduction
störschreiber-gerät
The right component shape for every application
erdschluss-kompensieren
Standard version for 20 kV networks to 1000 A Ice
rundsteuersignalanalyse
IO wiring with CIF possible
Simulation-Messwerte-Prozesswerte
Current injection with manual power reduction

Current Injection

CIF

The classic regulation process, i.e. searching for the resonance curve across the range of travel of the coil, can no longer successfully adjust the arc suppression coil in certain network situations. We have developed this current injection for the increasingly frequent cases where the zero-sequence voltage is highly disturbed or subject to extreme influences or where networks are highly symmetrical. The current injection creates a signal that is fed into the network via the auxiliary power winding of the arc suppression coil. From the network reaction, the combined REG-DP(A) and current injection are able to calculate a resonance curve despite the low or highly variable zero-sequence voltage.

Further questions or want to start an enquiry? Please click “Product Enquiry”.

The right component shape for every application

The modularly designed CIF can be deployed in diverse situations and installed in various different cabinets and housings. We offer the CIF in the following shapes:
• On an assembly plate for 19″ cabinet installation
• In a standard cabinet for interior installation
• In a standard cabinet for exterior installation
• In a standard cabinet for exterior installation (mast-mounted)
• In a standard cabinet for exterior installation (wall-mounted
•Up to 3 systems for 3 e-coils in one cabinet

Standard version for 20 kV networks to 1000 A Ice Special version for 110 kV networks with higher power

The 2-frequency CIF current injection can be used in 20 kV networks with average damping at up to 1000 A (capacitive earth current). The CIF can also be used in networks with lower or higher nominal voltages, whereby the maximum capacitive earth current will change in indirect proportion.

The CIF is also available as a more powerful variant with a higher feed current, specially designed for 110 kV networks with a large capacitive earth current.

Current injection with manual power reduction

For very small networks, the current injection can lead to undesirably strong influences on the zero-sequence voltage, meaning in the worst-case scenario that the earth fault threshold may be crossed. To prevent this, the power of the current injection can be reduced as needed.

IO wiring with CIF possible

To simplify the cabling between the REG-DP(A), the CIF and suppression coil, the I/O signals (peak/trough commands, limit switch, potentiometer) can be wired directly to the MCI.

Parametrisation control and connection via REG-DP(A)

By connecting the CIF unit to the REG-DP(A) regulator, the CIF can be parameterised, calibrated and controlled. Connection via all standard communications protocols is also possible. The REG-DP(A) regulator can be connected via REG-P, REG-PE or REG-PED SV control units. The following protocols are available (further protocols on request):

  • IEC 60870 -5 -101 / 103 / 104
  • IEC 61850
  • DNP 3.0 RTU / DNP 3.0 TCP
  • MODBUS RTU / MODBUS TCP
  • SPABUS

Do you have questions about the CIF Power Feed?

Our specialists will be happy to help you!


Contact us

AE Toolbox
The perfect supplement to arc suppression devices: freely adjustable project planning and parameterisation software

The AEToolbox works on a project basis and impresses with its range of functions and the versatility that the program offers.

News from the Productgroup

EORSys – News

Blogpost

International Partner Week 2024 – a Look Back

29. August 2024

Our International Partner Week 2024 – many old friends and new faces were our guests, it was a pleasure.[…]

Read more

Product innovation

Product Discontinuation: Profibus-DP in the Types B01 & B02 as of 15.05.2024

3. June 2024

Profibus-DP in the types B01 & B02 is currently scheduled for product discontinuation.[…]

Read more

General Knowledge

The Future of the Distribution Grid: Focus on Digital Secondary Substations

13. May 2024

In this technical report, Gerald Jacob (Product Manager »EORSys«) uses a specific example to illustrate how distribution system operators can meet the challenges of energy transition in the medium and[…]

Read more

General Knowledge

Earth fault explained – basics and functions of an electrical phenomenon

6. March 2024

Everything you need to know about earth faults – from the basics, causes and examples to the consequences. Find out more in this article about earth fault clearing, compensation, location and the benefits[…]

Read more

General Knowledge

Ready for the Smart Grid of the Future?

6. March 2024

All information about smart grids/intelligent power grids, the technology behind them, advantages, disadvantages, challenges and current distribution.[…]

Read more

Special Publication

Cost Efficient Management of Digital Secondary Substations: Earth Fault Indicator EOR-3DS as Digitisation Unit for Secondary Substations

11. August 2023

Digital secondary substations are becoming a key element for distribution system operators in terms of automation, monitoring, and efficient operations of their networks. Read this technical report about[…]

Read more

Blogpost

Kick-off for Mass Rollout of the Digital Local Network Station at »Netze BW«

31. July 2023

Our product manager Gerald Jacob (»EORSys«) with a short Q&A at the official kick-off event of the digital secondary station »FFU 2.0«.[…]

Read more

Product innovation

Product Discontinuation: Current Injection CI, as of 30.06.2023

14. July 2023

The Current Injection CI is currently scheduled for product discontinuation.[…]

Read more

Blogpost

Brand New: Short-Circuit and Earth Fault Indicator EOR-3DS Released on 27.03.2023

27. March 2023

New combined earth fault and short circuit indicator EOR-3DS: AVAILABLE FOR ORDER NOW[…]

Read more

Product innovation

Product Announcement: Short-Circuit and Earth Fault Indicator EOR-3DS Released on 27.03.2023

24. March 2023

New combined earth fault and short circuit indicator EOR-3DS: AVAILABLE NOW[…]

Read more

Blogpost

Product Announcement: Short and Earth Fault Locator EOR-1DS Released 05.08.2022

23. August 2022

We are pleased to inform you that the product »Combined Earth Fault and Short Circuit Indicator EOR-1DS« is officially released as of today. […]

Read more

Product innovation

Product Announcement: Short and Earth Fault Locator EOR-1DS Released 05.08.2022

23. August 2022

Combined earth fault and short circuit indicator EOR-1DS: AVAILABLE NOW![…]

Read more

Product innovation

Product Discontinuation: DIN Rail Housing EOR-3D (Characteristic B02) as of 30.06.2020

12. April 2022

The EOR-3D with characteristic B02 (article numbers: 119.8500 to 119.8584) is currently planned for product discontinuation.[…]

Read more

Product innovation

Product Discontinuation: Short-Circuit and Earth Fault Indicator EOR-1D, as of 31.03.2022 (Successor Will Be EOR-1DS)

12. April 2022

Read more

Product innovation

Product Care / Follow-up Device: EOR-3D B01 & B03 Become the Substantially Optimized EOR-3DS

12. April 2022

The EOR-3D with feature B01 or B03 (part numbers: 119.80xx to 119.82xx.xx) is currently planned for product discontinuation.[…]

Read more

Info letter

Info Letter No. 21: The Influence of the Contact Resistance at the Earth-Fault Location on the Zero Sequence Voltage UEN in Compensated Networks

7. September 2021

The earth fault in compensated networks is usually presented without a contact resistance at the fault…[…]

Read more

Info letter

Info Letter No. 20: Capacitance of Conductors

7. September 2021

In the conductors of electrical power supplies, a distinction is made between the operating capacitance… […]

Read more

Info letter

Info Letter No. 18: Transient Relay for High Resistance, Intermittent and Recurrent Earth Faults (Part 2)

7. September 2021

Figure 3 can also be used for the determination of static earth faults. In an isolated network the entire…[…]

Read more

Info letter

Info Letter No. 17: Transient Relay for High Resistance, Intermittent and Recurrent Earth Faults (Part 1)

7. September 2021

The statistics show that earth faults constitute a large proportion of network faults. Conventional relays…[…]

Read more

Info letter

Info Letter No. 15: Earth Fault Location Using the Harmonic Procedure (Part 2)

7. September 2021

For the study of the behaviour of the harmonic currents and voltages in the compensated network, at…[…]

Read more

Contact request:



* Mandatory

Your data is being processed

a-eberle kontakt newsletter ×