Product Care / Follow-up Device

EOR-3D B01 & B03 Become the Substantially Optimized EOR-3DS

Affected Product

Product changes, but also product discontinuations, mainly serve the purpose of continuous product improvement or stabilization of the product group with regard to hardware, firmware and related software.

Reason for Discontinuation

The EOR-3D has been completely redesigned for the following reasons:

  • Current procurement problems of differnet device components
  • Efficiency increase with regard to production and final inspection processes
  • New customer requirements in the area of functional scope and shortened installation depth

Replacement Device or Successor Device: EOR-3DS

EOR-3DS

Existing Devices in the Field

  • The assured warrenty period is observed in any case.
  • Product support für devices in the field will of course continue as usual
  • Repairs of the discontinued devices can be carried out until 31.12.2025 with current component availability.
  • After this date, or if component availability changes, a successor device / replacement device (see point 3)
  • will be available.

Transition Period (Last Order)

The transition period starts immediately (25.03.2022).
The product can be reordered up to and including 31.12.2022, insofar as material availability allows. (Date of receipt of the order).

ATTENTION:
Orders placed during the transition period cannot be cancelled. In addition, we reserve the right to limit the order quantity based on our manufacturing capacity and material availability.
Please pass this product information on to your employees, colleagues and, if applicable, your customers.


We apologize for any inconvenience this discontinuation may cause. We will do everything we can to make this action as smooth as possible and without impacting delivery times.


If you have any questions, please contact your first point of contact directly.

Need More Information?

Contact Us!


Contact

The A. Eberle Blog

Our latest articles

Power Quality Monitoring: Risks of Poor Power Quality

Power quality monitoring translates “invisible” disturbances into measurable causes and KPI impacts. This guide explains common power-quality events and a practical workflow to measure, evaluate and derive corrective actions.

Read more

Short video presentation »PQ-Box ONE«

Ahead of the official launch on February 25, 2026, we are releasing a short video about the new »PQ-Box ONE« that provides an initial overview of the key features of the new PQ measuring device.

Read more

»PQ-Box 150« and »PQ-Box ONE«

PQ-Box 150 and PQ-Box ONE in practical comparison: PQ-Box 150 and PQ-Box ONE both deliver Class A measurements, but differ in terms of installation, handling and areas of application.

Read more

A. Eberle welcomes Amarillo as a new REGSys® partner in Mexico

A. Eberle is expanding its international partner network and is pleased to welcome »Amarillo Naranja S.A. de C.V.« as a new »REGSys®«-partner in Mexico.

Read more

A. Eberle at the Schwabach City Run 2025

A. Eberle was represented by 37 participants at the 2025 Schwabach City Run, setting a new internal record for participation. Particularly noteworthy is Benjamin Rentsch's first place in the M 35 40 age group and third place overall.

Read more

TOP 100 Awards 2025: Innovation for the Energy Future

💡 As part of the TOP 100 Awards 2025, we were honored to receive a special recognition last week in Mainz – personally presented by TV host and science journalist Ranga Yogeshwar.

Read more

Contact request:



* Mandatory

Your data is being processed

a-eberle kontakt newsletter ×

The download started automatically in a new window.

How did you hear about us?
Consent to data transfer*

* Mandatory fields