Performance increase in the distribution grid

Our Low Voltage Regulation System LVRSys™ as a useful tool for the future

Grid congestion causes rejection of PV connection requests by grid operators

Due to economic unreasonableness, grid operators are rejecting applications to connect PV systems in the low-voltage grid more often. The responsible grid planners are guided by the connection guideline VDE-AR-N 4105, in which decentralized generation facilities may only raise the voltage level in the low-voltage grid by 3% compared to the previous situation. Potential photovoltaic plants are thus not realized, despite existing technical transmission capacity.

The current-carrying capacity of the grids is rarely approached by complying with the directive.

The following voltage drop analysis demonstrates the limitations of integrating photovoltaic systems into the low-voltage grid using traditional calculation methods and outlines a way out using the Low Voltage Regulation System LVRSys™.

Voltage increase due to grid integration of PV systems

According to the fundamentals of electrical science, the voltage drop of power along a line can be calculated using the following formula:

Figure 1 illustrates the normalized voltage drop (3%) from the line impedance (line length and cross-section) depending on the power. Aluminum cables with cross sections of 4 x 150 mm² and 4 x 240 mm² are frequently used in the European low-voltage grid. These cables may be loaded up to a length of 120 m or 140 m at 100 % (250 kW / 186 kW) and at a length of 500 m at the end of the cable only with 42 kW or 65 kW, respectively, in order to comply with the 3 % criterion. After 500 m, the load of the cables is only approx. 25 %. Therefore, after a short cable length, the limiting parameter for the connection of distributed generation plants is no longer the current carrying capacity, but the voltage maintenance.

Figure 1: Permissible active power according to cross-section and cable length for a voltage drop of 3%
Figure 2: Permissible active power according to cross-section and cable length for a voltage drop of 9%

Using a LVRSys™ low-voltage control system with an exemplary control range of ±6%, the permissible voltage drop that must be maintained increases from 3% to 9% (Figure 2). The 4 x 150 mm² or 4 x 240 mm² cables can be 100% loaded by using the controller up to a length of 350 m or 390 m, respectively, without violating the 3% criterion. The grid integration of decentralized generation facilities can therefore be increased up to the technical utilization limit (current carrying capacity) of the cables. For longer cable sections, the grid integration can be increased 4-fold by using controllers.

This example illustrates that the LVRSys™ is a building block for low-voltage grids to advance the energy transition in a cost-effective manner.

Do you have questions about our LVRSysTM?

Contact us!


Contact

You might also be interested in

Creating Power Quality surveys with PQ-Box and WinPQ mobil software

The following report displays the PQ-Box and WinPQ mobil software interact to allow an evaluation of the disturbance levels at a measuring point according to approved grid norms.

Read more

Measurement of voltage distortions in industrial grids with the PQ-Box 50

It is important to find disturbances in the system in a fast and reliable way. This report shows an example for trouble shooting with the Power Quality analyzer PQ-Box 50.

Read more

Power Quality Measurements: The Third Harmonic

This special publication intends to illustrate a typical power quality measurement and the aspects, which should be taken into consideration conducting the measurements.

Read more

Power Quality Measurements: The N-Conductor & Harmonics

In power quality measurements, odd harmonics such as the 15th, 21st & 27th are often violated. What are harmonics anyway, how does this circumstance occur and what influence does this have on the neutral conductor.

Read more

Contact request:



Your data is being processed

a-eberle kontakt newsletter ×