+++ PQ-Box Trade-in Promotion: Only From 01.09. – 31.12.2024 +++ Attractive Discount on Your PQ-Box Order +++ Click Here for More Information! +++

+++ PQ-Box Trade-in Promotion: Only From 01.09. – 31.12.2024 +++ Attractive Discount on Your PQ-Box Order +++ Click Here for More Information! +++

+++ PQ-Box Trade-in Promotion: Only From 01.09. – 31.12.2024 +++ Attractive Discount on Your PQ-Box Order +++ Click Here for More Information! +++

Motorway rest stop pilot project

Power cuts shut down water pumps and pose great challenges for the North-Bavarian motorway directorate.

The challenge

In 2018, the “Auergründel” PWC (car park with WC) on the A6 suffered repeat failures of its fresh and waste water pumps. The motorways directorate suspected the cause was high loads on the low-voltage cables. The short-circuit power of the network at the parking place was suspected to be insufficient to provide stable pumping.

What we did

Through a power quality (PQ) measurement with our PQ-Box 150, we determined that the 10 minute voltage averages were below the nominal voltage. This allowed us to determine that, when the pumps started up, the voltage at the connection point collapsed to the point that the frequency converter switched to error mode and reported an undervoltage. Increased power requirements during start-up can be compensated for by our low-voltage regulation system LVRSysTM, which provides increased current.

The result

Since the installation of the LVRSys, no further faults in the control electronics have been reported. LVRSysTM solves problems at motorway car parks like “Auergründel”, thus preventing the failure of gantry signage, water pumps and lighting systems at parking spaces and rest facilities.

You can find the detailed application report here (German and English).

Sie haben Fragen?

Zögern Sie nicht, kontaktieren Sie uns


Jetzt Kontaktaufnehmen

Experimental Validation of a Low-Voltage Regulator Model – Case Study of a Maltese Low-Voltage Grid

This application report addresses the integration of the »LVRSys® Low-Voltage Regulation System« into the low-voltage grid in Malta.

Read more

Cost Efficient Management of Digital Secondary Substations: Earth Fault Indicator EOR-3DS as Digitisation Unit for Secondary Substations

Digital secondary substations are becoming a key element for distribution system operators in terms of automation, monitoring, and efficient operations of their networks. Read this technical report about the EOR-3DS in its role as digitisation unit for secondary substations.

Read more

Ferrari´s Meter vs. Electronic Meter

This technical report analyzes a power measurement at a large industrial customer. The customer records very high currents and fifth harmonic voltages during production time, which leads to poor voltage quality.

Read more

Angle determination of voltage and current harmonics in practice

Today’s devices and equipment such as switched-mode power supplies, frequency converters, regulated drives, charging devices for e-mobiles or LED lighting work internally with high clock frequencies in order to regulate power efficiently. These can lead to both conducted and field-bound (coupled) influences in the energy grid. In this technical report, we explain how you can detect these sources of interference in the grid using suitable measuring technology.

Read more

Passendes Zubehör

Contact request:



* Mandatory

Your data is being processed

a-eberle kontakt newsletter ×

Our seminars &
webinars

► Register here!

x