Parallel Operation of Step Transformers

Info Letter No. 13

The rule of thumb that with parallel operation of transformers the ratio of the rated outputs should not exceed the value 1 :  2 (in accordance with DIN VDE 0532), can serve as a rough guide only, because the actual criteria in this rule are not directly visible. In addition, the permissible ratio also depends on the state of the art, because in the last few decades the limit has still been considered to be 1 :  3. Overall, too much attention is attached to this rule, to which a certain arbitrariness adheres.

Conditions for Safe Parallel Operation

A safer and more parallel operation of transformers is guaranteed only if their performance, i.e. whose rated outputs can be exploited fully and without overloading an individual transformer. There are two conditions to be met for this:

1)   Equality in value, frequency and angle of the voltages because with inequality in these values a transient current flows in the parallel transformer windings.

2)   Equality of the relative short-circuit impedances of the transformers (magnitude and angle), so the proportion of the network load for each transformer is proportional to its rated output.

The transformers' primary side must therefore be at the same voltage, and the voltages on the secondary side must each have the same value and the same angle. For the characteristics of transformers this means:

  • the same switching group characteristics
  • the same transfer ratios
  • the same relative short-circuit impedances

The Rated Power

For voltage regulation with parallel operating transformers no further claims are made.

The rated output, the most important characteristic of the transformer, has superficially in connection with the parallel operation no importance. However, taking into account economic considerations, according to the "laws of growth" of the transformers, for a given power rating there is inevitably a certain value for the relative short-circuit impedance and the relative magnetization current. Thus, there is ultimately a relationship between the rated output and the values of the two variables. The quantitative relationships, however, change with the value of the rated output (see table).

Automatic Voltage Regulation With REGSys® - Proven a Thousand Times Over, Multifunctional and Flexible

Need More Information?

Contact Us!


Contact

Info-Letters

Click Through Our Info Letter Series

News From the Product Groups

REGSys® | – News

Webinar

»Cyber Security« Webinar: A Challenge for European Energy Companies

Webinar recording from 2025-11-26: »Cyber Security« - A Challenge for European Energy Companies

Read more

Blogpost

A. Eberle at the Schwabach City Run 2025

A. Eberle was represented by 37 participants at the 2025 Schwabach City Run, setting a new internal record for participation. Particularly noteworthy is Benjamin Rentsch's first place in the M 35 40 age group and third place overall.

Read more

Blogpost

A. Eberle welcomes Amarillo as a new REGSys® partner in Mexico

A. Eberle is expanding its international partner network and is pleased to welcome »Amarillo Naranja S.A. de C.V.« as a new »REGSys®«-partner in Mexico.

Read more

General Knowledge

Power in Multiphase Systems

This technical report highlights the special features of power transmission in three-phase systems and offers valuable insights into the optimisation and analysis of modern power grids.

Read more

Blogpost

Visit From the Rudolf Diesel Technical School at A. Eberle

We were happy to welcome you, Rudolf-Diesel-Fachschule! Yesterday, we had the pleasure of welcoming two classes of future electrical engineering technicians from the Rudolf-Diesel-Fachschule Nürnberg to our company in Nuremberg.

Read more

Blogpost

TOP 100 Awards 2025: Innovation for the Energy Future

💡 As part of the TOP 100 Awards 2025, we were honored to receive a special recognition last week in Mainz – personally presented by TV host and science journalist Ranga Yogeshwar.

Read more

Blogpost

University Excursion: Pentecost Excursion of the Friedrich-Alexander-University Erlangen-Nuremberg (FAU)

As a company dedicated to innovation, education, and the energy transition, we are pleased to have once again supported the Whitsun excursion of Friedrich-Alexander University Erlangen-Nuremberg (FAU) this year.

Read more

Blogpost

Further Growth at A. Eberle

Welcome to the team! We welcome our new colleagues at A. Eberle.

Read more

General Knowledge

Voltage Stabilisation

In this article, you will learn why voltage stabilisation in high, medium and low-voltage grids plays a central role in safe and efficient grid operation. You will learn the basics of ‘voltage stabilisation’ and get to know modern control solutions to reliably compensate for voltage fluctuations and ensure sustainable grid quality.

Read more

Training Video

»REGSys®« Training Video 8: Overview SCL-Config for IEC 61850

In this video you will learn how you can export a CID file, how to adjust the IED name and working with the SCL-Config.

Read more

Training Video

»REGSys®« Training Video 7: How to Use the Winconfig Software

In this video you will learn how to create a new parameter file, how to upload setting files or download setting files from the Scada card and what kind of parameters a setting file contains.

Read more

Training Video

»REGSys®« Training Video 6: Firmware Update via Winconfig

In this video you will learn when it is reasonable to use the WinConfig for a firmware update and how to do a firmware update with the WinConfig.

Read more

Training Video

»REGSys®« Training Video 5: Firmware Update via RPL2

In this video you will learn how to create a physical connection before the firmware update, how to use the RPL2 software and how to do a small test after the firmware update.

Read more

Training Video

»REGSys®« Training Video 4: Changing the Default Password

In this video you will learn how to connect the SCADA card to your computer, start the software WinConfig and change the default password and define a new one.

Read more

Training Video

»REGSys®« Training Video 3: Changing IP Address via Winconfig

In this video you will learn how to define a new IP address, how to interpret the “States of detected boards” and how to determine the port numbers of the physical ports.

Read more

Training Video

»REGSys®« Training Video 2: Changing IP-Address via Webserver

In this video you will learn how to access the web server, how to change the network settings in the web server.

Read more

Training Video

»REGSys®« Training Video 1: Adjusting the Time Synchronisation

In this video you will learn how to connect the SCADA card to your computer, start the software WinConfig and change the default password and define a new one.

Read more

General Knowledge

Measuring the Voltage Drop

The voltage drop is the difference between the voltage at the beginning and end of an electrical line. In an electrical network, the voltage can be reduced by the resistance and impedance of the lines, resulting in a lower voltage reaching the consumer than was originally fed in. Find out everything about measurement and calculation in this article!

Read more

Blogpost

International Partner Week 2024 - a Look Back

Our International Partner Week 2024 - many old friends and new faces were our guests, it was a pleasure.

Read more

General Knowledge

REGSys® Parallel Regulation of Transformers With Tap-Changers

The regulation of transformers with tap changers is an essential subject within the field of power supply and distribution. Today these tasks are accomplished electronically with high regulation quality. Digital regulators, such as the freely programmable REGSys® voltage regulator system, are in use.

Read more

Info letter

Info Letter No. 16: Hot-Spot Temperature and Service Life of Transformers

The failure of a transformer not only has major economic consequences for the energy supplier, it can...

Read more

Info letter

Info Letter No. 11: Voltage Regulation With Step Transformers in Parallel to Busbars (Part 3)

Direct measurement of the circulating current is not possible with the usual measurement...

Read more

Info letter

Info Letter No. 10: Voltage Regulation With Step Transformers Parallel to Busbars (Part 2)

The following considerations apply to a symmetrical operation of a three-phase network, so that the...

Read more

Info letter

Info Letter No. 9: Voltage Regulation With Step Transformers in Parallel to Busbars (Part 1)

Within a station, the transformers are in close proximity. Therefore, the line impedances between the...

Read more

Info letter

Info Letter No. 7: Load-Dependent Voltage Change

For the regulation of the voltage ULoad at a predetermined value at the specified load point (e.g. the...

Read more

Contact request:



* Mandatory

Your data is being processed

a-eberle kontakt newsletter ×

The download started automatically in a new window.

How did you hear about us?
Consent to data transfer*

* Mandatory fields